AI-Powered · Any CSI Division · Veteran-Owned

Takeoff. Specs.
Compliance.
Done.

TM Takeoff reads your blueprints and specification documents simultaneously — extracting quantities, surfacing compliance requirements, and generating your complete bid package in minutes.

Over 93% extraction accuracy
Any CSI division
SOC 2 compliant
FL License #ES12002306
93%+
AI Accuracy
3.8h
Avg. Time Saved Per Takeoff
100%
Proposals Include Compliance Checklist
$85M+
In Project Estimates Processed

Everything you need.
Nothing you don't.

Built by a contractor, for contractors. Every feature solves a real problem we lived through in the field.

Full Pipeline Transparency
See exactly what happened to every page — uploaded, read, classified, extracted, or skipped. Nothing is a black box.
No Black Box
Spec & Compliance Intelligence
We read your spec documents alongside blueprints — surfacing submittals, UL listings, NFPA requirements, warranties, and installation standards before you bid.
Major Differentiator
Blueprint Quality Scoring
Score every GC, engineering firm, and architect by resolution, organization, completeness, and yield rate. Know who produces AI-ready drawings.
Industry First
Complete Document Generation
Takeoff sheets, RFIs, scope of work, compliance checklist, internal proposals, client proposals — all generated automatically from your blueprint set.
8 Output Documents
Any CSI Division
Not locked to a single trade. TM Takeoff processes blueprints across any CSI division with over 93% accuracy. Electrical, low voltage, mechanical, civil — all covered.
No Trade Limits
Quality Report & History
Month-by-month history of every page processed, task run, and document generated. Full transparency into what the AI did — and why.
Full Transparency

From upload
to bid-ready
in minutes.

Our two-pass AI pipeline processes your blueprints and specs simultaneously — so you get quantities and compliance in one shot.

01
Upload Blueprints + Specs
Upload your blueprint PDF and specification documents. TM Takeoff accepts any file size, any scan quality.
PDFAny DPIAny Division
02
AI Reads Everything
Pass 1 classifies every page by division. Pass 2 extracts quantities, schedules, and notes. Simultaneously, specs are parsed for compliance obligations.
Two-Pass AISpec Analysis93%+ Accuracy
03
Compliance Checklist Generated
Every submittal requirement, product standard, testing obligation, and warranty condition is surfaced — before you sign anything.
SubmittalsUL ListingsNFPAWarranties
04
Complete Bid Package Ready
Takeoff sheet, RFIs, scope of work, compliance checklist, and client proposal — all generated and ready to review.
8 DocumentsExcelPDFWord

Know what you're
committing to
before you bid.

Most estimators skip the specs or skim them. One missed compliance requirement can cost you thousands after award. TM Takeoff reads every word so you don't have to.

Real example from a customer:
"TM Takeoff caught a testing requirement on a school project that would have cost us $12,000 after award. That one catch paid for the platform for years."
— Low-voltage contractor, Florida
Submittal Requirements
Every product that requires a submittal is extracted from the spec and listed with its section reference.
UL & Product Standards
UL listings, NFPA standards, IEEE requirements — flagged automatically by division and tied to quantities.
Testing & Inspections
Commissioning, load testing, fire alarm testing, acceptance testing — all extracted and included in your bid package.
Warranty Requirements
Minimum warranty periods per product type and labor guarantees — know your obligations before you sign.

Contractors who switched
don't go back.

★★★★★
"TM Takeoff doesn't just count quantities — it reads the specs too. We caught a testing requirement on a school project that would have cost us $12,000 after award."
RR
Roque Rivera
President · Top Wire Techs LLC · Florida
★★★★★
"We cut our Division 26/27/28 takeoff time from two full days to under two hours. The Quality Report alone showed us which architect firms actually produce AI-ready plans."
EC
E. Calvo
Estimator · Low-Voltage Contractor · Florida
★★★★★
"The compliance checklist saved us on a government job. We had no idea there was an NDAA hardware requirement in the spec. TM Takeoff found it before we submitted."
PM
P. Montalvo
Project Manager · Security Contractor · Florida
GET STARTED TODAY

Ready to bid smarter?

See TM Takeoff process a real blueprint set in a live demo — no commitment, no credit card.

Mon–Fri · 8 AM – 5 PM EST